Quality Inspection

During the produce of injector nozzle nuts, there are totally 15 steps of quality inspection. They are selection of raw material, the inspection during production and inspection of finished products. In these 15 steps, one step missed can cause the bad quality or failure production, therefore, every process has specific workers to responsible, and that finally made our professional production team.

Here are some description of injector nozzle nuts’ produce processes:

1. Inspect raw materials and make backup of raw materials test report;

2. Cutting raw materials with blanking machine;

3. Inspect raw material’s cutting diameter and length;

4. Forging and forming processing on the raw materials;

5. Inspectors conduct the all kinds of inspections of forming blank;

6. Remove the blank scrap ;

7. Blast the surface of the blank;

8. Conduct surface treatment inspection after sandblasting;

9. Perform blank machining;

10. Process injector nozzle nut ‘s body seal threading;

11. Process injector nozzle nut body connection threading;

12. Process injector nozzle nut ’s hole;

13. Inspector conducts general inspection;

14. Install the injector nozzle nut ;

15. The packing workshop finish product packaging.

Before sending out of the factory, the finished injector nozzle nuts still need to undergone through three inspections—full inspection, random inspection, and batch inspection. In these inspections, different brands of test benches are used to test the same injector nozzle nut for total of no less than three times.

Apart from above, injector nozzle nut is one of the most important running parts, it is also one of parts with the highest damage rate, even tiny particles can cause failure of injector nozzle nut and even entire components. So it is important to make sure the whole produce process and installation and its working place are dust-free.